0

About us

14
Country
5028
Implemented projects
388
Customer companies

Full cycle of equipment production

alt
01
Design

Development of design documentation including strength calculations

alt
02
Procurement

Procurement of raw materials and components from leading Russian and international suppliers

alt
03
Production

Production of equipment in the shop by qualified workers

alt
04
Testing

Tests in the factory laboratory

alt
05
Shipment

Shipment by the required mode of transport

alt
06
Site assembling

Final assembly/installation of equipment at the customer's site

01
Design
02
Procurement
03
Production
04
Testing
05
Shipment
06
Site assembling

Our advantages

ISO 9001 Quality Management System
We work according to Russian and international design standards
Delivery of standard and oversized equipment worldwide
Full cycle: design, manufacturing, testing, delivery, assembly
Continuous quality control to ensure full compliance with project requirements
Extensive experience of work with leading international EPC / EPCM companies

Industries

Quality Management System

International standard

The quality management system of ZAVKOM JSC is certified according to the ISO 9001 standard, which is confirmed by the corresponding certificate

Customer focus

Understanding and continuously analyzing current and potential customer needs to meet the requirements of custom specifications

Employee engagement

Employees of ZAVKOM JSC are regularly trained to understand and follow the provisions of the quality policy in order to achieve and maintain a leading position in the market

Staff

All personnel undergo regular training and professional development programs in accordance with Russian and international standards

1100
Employees
including
650
Workers
110
designers
30
QA/QC staff
alt
alt
alt
alt
alt

The body of the sulfur furnace is made complete with flues

The body of the sulfur furnace is made complete with flues

The body of the sulfur furnace is made complete with flues

The body of the sulfur furnace is made complete with flues

The body of the sulfur furnace is made complete with flues

1
7
History
1934
1934
1946
1948
1962
1966
1967
1970
1977
1992
1998
2000
2001
2002

The first unit for the separation of coke cooling was manufactured, and other equipment for the chemical industry is also being produced in parallel.

The production of large-sized devices made of corrosion-resistant and heat-resistant steels has been mastered.

Production of water desalination plants and heat exchange equipment for the shipbuilding industry has begun, including the desalination plant for the nuclear icebreaker "Lenin".

Heat exchangers used in installations for the production of helium from natural gas by deep deposition are produced.

 By the Decree of the Presidium of the Supreme Soviet of the USSR, the plant was awarded the Order of the Red Banner of Labor for ensuring high growth rates in the production of complex capacitive chemical equipment.

The beginning of cooperation of the plant with scientific research institutes in the field of nuclear and radio engineering industry, a resonator for the Serpukhov synchrophasotron was manufactured.

Mastered the technology of manufacturing equipment from bi and trimetal by vacuum diffusion welding for particularly aggressive products and research in the field of nuclear physics.

Production of installations for membrane separation of liquid media, as well as installations for separation of gas media on the basis of hollow fiber is mastered.

Production of complex lines of boiling and saccharification of starch-containing raw materials for distilleries, equipment for distilleries, wine, beer and non-alcoholic plants, shut-off valves began.

Production of plants for processing transformer oils, obtaining gases by the adsorption method (oxygen, nitrogen), fire equipment, beer tanks was mastered.

Production of equipment for the gas industry was mastered.

Production of equipment for the nuclear power plant was mastered. Equipment was developed, manufactured and delivered: the filter system of the SAOZ pits, for the 3rd and 4th blocks of the Kola NPP.

Devices with a mixing device for the Tianyanwan NPP of the People's Republic of China were manufactured and delivered.